自慰视频,自慰视频网站

  •  Hubei giant coating Co., Ltd.

    Hubei giant coating Co., Ltd.

Coating defects and Solutions

Browse volume

The requirements for the construction of water-based paint are as follows:
First, the construction environment suggests installing dehumidifiers. The power of the dehumidifier is as follows: 100 square 2 units 10 kilowatts of power, construction humidity control at 30 degrees Celsius, humidity below 70 degrees, so as to ensure the best effect of waterborne paint.
Second. The moisture content of all solid wood is controlled by 8%-12% in the south. The moisture content in the north is the best in 12%-14%. The problem of preventing wood cracking and lumber moisture from being too high affects the adhesion of paint.